CV , Memory of Activity , Publications (soon to be updated)


Software : (2003-2004)

 Petal cooling  : July 2003 testspictures and results (July),     October 2003 tests results, pictures (october)
Slow control software-CMS TEC petal  longterm tests; access to the LLN Slow Control Main_Panel


 RD39  Collaboration CERN: 

Status Report in Louvain la Neuve 2004.

'cut-baby' detectors:  

SET 1 (no etching) I-V; SET 2 (etching after cut) I-V charact. diff. T; results
- 'Cold hybrids' tests- root files, graphics
dec 2004 ¨Ctests before mounting the edgeless baby-detectors in ¡®edgeless¡¯ module: I-V charact., single strip current meas.


New : 2008

Simulation results with ISE_TCAD for Central_Europe_Consortium for SLHC



Web LINKS : FI page , CERN page , PISA page , may2003 testbeam and photos1and photos2 

- TOTEM link

- RD 39 link